Selective demolition is the default in Boston rather than a specialism, because very little here is free-standing. Taking out a floor bay, a stair core or a bearing wall in a building that stays loaded means an engineer's temporary works design, a sequence that is followed rather than improvised, and a structure as sound at the end of each shift as it was at the start. In the older masonry stock the added question is what the party wall is actually doing — often more than the drawings suggest.

What the job covers

  • Removing structural bays, floors, roofs, mezzanines and stair cores while the frame stays up
  • Taking out process equipment, tanks, conveyors and platforms in working industrial buildings
  • Temporary shoring and needling where loads have to be carried around the removal
  • Openings cut through floors and walls for new stairs, shafts, lifts and services
  • Weather protection where the envelope is opened up
  • Working around live process, power and occupied areas
  • Cut, rigged and lowered rather than dropped, where dropping is not an option

What moves the price

  • Whether the element coming out is carrying load, and what carries it instead
  • Whether the building keeps operating during the work, and what cannot be interrupted
  • Access for rigging — what can be craned, what has to come out in pieces through a door
  • Vibration limits where sensitive equipment, historic fabric or an adjoining structure is close by
  • Whether an engineer's sequence and temporary works design are required, which on most structural removals they are
  • How much of the removal has to happen outside production or trading hours

Working in Boston

Boston carries the widest range of demolition work in the region because it holds the widest range of buildings — nineteenth-century masonry downtown and in the Back Bay, institutional and medical buildings through the Longwood area, and new commercial fabric in the Seaport. Almost all of it is attached, occupied or both, so the work is overwhelmingly selective and interior rather than full teardown. Inspectional Services wants the asbestos survey and proof of utility disconnection before a demolition permit issues.

Allied covers Boston and the rest of Suffolk County — all demolition services in Boston.

Common questions

Do I need a structural engineer?

If anything being removed carries load — a beam, a column, a bearing wall, a floor bay — then yes, and the building department will ask for the drawings before it issues a permit. Allied works to that engineer's sequence rather than around it. For non-structural removal, partitions and finishes, it is generally not required.

Can you work at night or on weekends?

Often it is the only way the job works, particularly in occupied commercial buildings and in industrial plants that cannot stop production. Municipal noise restrictions and the building's own rules set the actual window, so it is worth confirming both before the schedule is fixed.

Ready To
Clear The Way?

Tell us about the project. Allied will take it from there.

Call nowGet a quote