Norfolk County

Residential Demolition in Quincy

Quincy is one of the few places close to Boston where a residential teardown can run the way it is supposed to. Lots are large enough for a machine and a container, the streets take a truck, and much of what is coming down is postwar housing being replaced with something bigger. The thing that actually moves the date is the same as everywhere else — utility disconnections and the asbestos survey — not the demolition.

What the job covers

  • Houses, two- and three-family buildings, garages, additions, porches and outbuildings
  • Full teardown to grade, or partial demolition where an addition comes off and the house stays
  • Utility disconnection coordinated and witnessed before the work starts
  • Protection of the neighbouring property, shared walls, fences and landscaping
  • Foundation and slab removal, backfilled and compacted
  • Site graded and left clean and safe
  • Debris hauled off, with recycling where the job allows

What moves the price

  • How close the structure is to the property line and to the house next door
  • Access — whether a machine and a container can both reach the site, and whether the street needs a permit to stage on
  • Age of the building, which drives the likelihood of asbestos and lead and therefore the survey and abatement in front of the job
  • Whether the town requires a demolition delay review, which several Greater Boston municipalities apply to older buildings and which can add months
  • Whether the foundation comes out or stays for the rebuild
  • Tree protection and landscaping the owner wants kept

Working in Quincy

Quincy has been rebuilding itself steadily — downtown redevelopment, commercial corridors turning over, and residential lots where a modest postwar house comes down for something larger. There is generally room for equipment, which makes mechanical demolition viable in a way it often is not inside the city, and the older granite and masonry buildings add concrete cutting and removal work.

Allied covers Quincy and the rest of Norfolk County — all demolition services in Quincy.

Common questions

What is a demolition delay bylaw and does it affect me?

A number of Massachusetts municipalities have a bylaw that lets a historical commission review — and temporarily hold — the demolition of a building over a certain age, commonly anything built before a set year. It does not stop the work, but it can add weeks or months, and it catches people out because it applies to ordinary houses, not just landmarks. Check it with the town before you set a date. It is the single most common reason a residential demolition slips.

Do I need an asbestos survey on a house?

For anything built before the 1980s you should assume yes. Siding, floor tile and its mastic, pipe insulation, roofing and some plasters are all common sources in New England housing stock. The survey is inexpensive relative to the delay of finding it after the permit is issued.

How long does a house take?

The physical teardown of a typical single- or two-family house is usually a matter of days once the site is ready. What sets the actual date is everything in front of it: utility disconnections, the asbestos survey and any abatement, the permit, and a possible demolition delay review.

Residential Demolition elsewhere

Ready To
Clear The Way?

Tell us about the project. Allied will take it from there.

Call nowGet a quote