Middlesex County

Commercial & Industrial Floor Removal in Cambridge

Floor removal is the phase most likely to hold up a Cambridge fit-out, and the reason is almost always the adhesive. In any building whose last refit was before the 1980s, the black cutback mastic under the tile has to be tested before it is disturbed — and if it comes back positive it stops being a floor job and becomes an abatement with a notification period attached. Testing early is what keeps that off the critical path.

What the job covers

  • VCT, vinyl, sheet goods, carpet, carpet tile and rubber
  • Ceramic, porcelain, quarry tile and thin-set
  • Terrazzo, epoxy, urethane and coatings
  • Hardwood, engineered timber and underlayment
  • Adhesive and mastic residue ground back to substrate
  • Ride-on and walk-behind machines sized to the space, with dust extraction
  • Substrate left clean, sound and ready for the next installer

What moves the price

  • Total area, and how much of it a ride-on machine can reach
  • What the adhesive turns out to be — in pre-1980s buildings black cutback mastic may be asbestos-containing and must be tested before it is disturbed
  • How many layers there are; older floors are often two or three installations deep
  • Whether the building stays occupied, which sets working hours and dust containment
  • How the debris leaves the floor — tile is heavy and volume adds up fast
  • How flat and sound the substrate has to be for the specified new finish

Working in Cambridge

Cambridge demolition is mostly interior, mostly occupied and mostly coordinated around research or institutional operations that cannot be interrupted. Lab and office fit-outs drive constant strip-out and floor removal work, and the older commercial and converted industrial buildings around Kendall and Central regularly need structural openings cut for new services. Work hours and loading access are usually set by the building, not the contractor.

Allied covers Cambridge and the rest of Middlesex County — all demolition services in Cambridge.

Common questions

Is the black glue under old tile asbestos?

It might be. Black cutback adhesive and the tile above it were both common asbestos-containing materials into the 1980s, and in Massachusetts you do not get to guess — it is tested before it is disturbed, and if it is positive it is handled as an abatement with the required notification. Budget for the test; it is small money against the cost of stopping a fit-out.

How clean does the substrate end up?

As clean as the next finish needs, which is the standard worth agreeing up front. A carpet tile installation and a polished or coated slab want very different things from the same floor, and grinding to the higher standard when it is not needed is wasted money.

Ready To
Clear The Way?

Tell us about the project. Allied will take it from there.

Call nowGet a quote