Suffolk County

Asbestos Removal in Revere

Most of Revere's housing predates the point where asbestos stopped going into buildings, which means a survey before renovation or demolition is the normal case here rather than the cautious one. Siding, pipe insulation, floor tile and the black mastic under it are the usual finds. The part that catches owners out is not the removal, it is the MassDEP notification period in front of it — that is a fixed wait set by regulation, and it is the reason abatement should be the first thing booked on a project rather than the last.

What the job covers

  • Survey and sampling to identify what is actually present before anything is disturbed
  • Notification filed with MassDEP ahead of the work, with the required waiting period observed
  • Containment, negative air and decontamination set up before removal starts
  • Pipe and boiler insulation, floor tile and mastic, plasters, roofing, siding and transite
  • Removal, bagging and transport to a licensed disposal facility, with the waste manifested
  • Clearance air monitoring before the containment comes down
  • Documentation handed over for the building file and the demolition permit

What moves the price

  • What the survey finds, how much of it there is and where it is
  • Whether the building is occupied, and whether it can be vacated for the work
  • Friable versus non-friable material — friable is more tightly controlled and slower
  • The notification period, which is set by regulation and cannot be compressed
  • Access and containment complexity, particularly around live services and shared systems
  • Disposal volume and the distance to a facility that will accept it

Working in Revere

Revere is a short run from the East Boston yard and mixes dense residential streets with commercial frontage along Broadway and the Squire Road corridor. The housing is largely pre-war and close-set, so residential work here is about protecting the building next door as much as removing the one in front of you. It is also the one town the previous site targeted, and the search demand is real.

Allied covers Revere and the rest of Suffolk County — all demolition services in Revere.

Common questions

Do I need an asbestos survey before demolition?

In practice, yes. Massachusetts requires asbestos-containing material to be identified and removed before demolition or renovation that would disturb it, and the local building department will generally want to see the survey before it issues a demolition permit. Any building from before the 1980s should be assumed to contain something until a survey says otherwise.

How long does the notification take?

MassDEP requires advance notice before the work begins, and that waiting period is set by regulation rather than by the contractor — it is not something that can be shortened by paying more or starting early. It is the reason abatement should be the first thing scheduled on a project, not the last.

Can I just leave it and demolish around it?

No. Demolishing a structure with asbestos still in it disperses the material, and it is both illegal and expensive to resolve afterwards. Emergency situations have their own procedures, but they are not a way around the requirement.

Asbestos Removal elsewhere

Other work in Revere

Ready To
Clear The Way?

Tell us about the project. Allied will take it from there.

Call nowGet a quote